PRP not workin properly
Hi All
i'm running a PRP (Project MRP)and it s happening a very strange thing: the demand of an item project configured is not exploded if i run the MRP (R3482) with a data selection not for a specific item or Group of items (the problem is not for an item, but for all) .
But if i run the MRP for the single item or the set of item involved in the demand creation everything works fine.
I use for the 2 example the same version with the same parameters.
The items are well configured and the Low level code calculation run every nights.