DRP overrule supply in demand branch
Hi,
I have a DC that has a BP relationship with a Mfg BP with 100 percent source.
Forecasts are at the DC level, SO are entered at the DC. Forecast consumption is used in the DC
In some cases the DC can purchase its demand directly from a supplier (no outside process required) when the capacity is max in the MFG BP.
DC: demand 3000 ea
PO in DC=3000
Results are ok.
Increase demand to 4000
After R3483 I have the following messages:
Cancel PO in DC
Generate WOs and OT from DRP for 4000
If I freeze the OP in DC then the DRP would ask 1000 from the Mfg BP..