Reinstating a 2 instance primary database after failover to a single instance physical database
Consider:
Primary database: 2 instance RAC
Standby database: single instance physical
I have successfully failed over from primary to standby. In order to get back to my original configuration of 2 instance primary, do both of those instances need to be up when the database gets reinstated? Do they both need to be up for resolving gaps?