Hi,

Is there a way to have each of the Co-by simulated cost equal the process simulated cost?

All CO-BY are at 100% cost in P3404.

CO-BY in P3002P cannot be at 100% each.

I discussed this with Larry B and I cannot find what was the solution. it was a year ago or more

Thanks for your help