P6 v17 Earned Value Not Correct when Assign the baseline

edited Jul 27, 2019 5:03AM in Primavera (MOSC) 2 commentsAnswered

Hi

am using p6 v17.1, When I assign the baseline the earned value change to Zero (0), I tried it in P6 V18 everything was good, is this an issue in v17 ????