Rework work order for configured item

edited Jul 27, 2019 5:05AM in Manufacturing - JDE1 (MOSC) 1 commentAnswered

Hi,

We are using JDE 9.1 and Configurator. Is it possible to create rework work order for configured item A (correct configuration) with parts lis added manually with configured item A (bad configuration) and component B. How cost will be calculated for new lot? The expectation is that cost should be calculated based on cost of configured item A (bad configuration) + cost of additional component.

Thanks,

Jarek