P30200 Extends Lower Level BOM Quantity Wrong In Multi-Level Mode
In a mulit-BOM the lower level qtys are not extended out by the required
quantity of the upper level.
For example : if the lower level sub assembly component require 2 of each to make 1 of its sub assembly parent and sub assembly parent needs 2 to make the upper level parent then the multi-level BOM inquiry should show 4 ea of each
of both the lower level components instead of 2 ea.
Thanks,
Chirag