Modelling Parallel Operations and Completions using a Single Work Order
Hi All,
We are using EBS R12.2.6 and we are in the middle of an Implementation project involving Oracle WIP Module. We have a Sub-Assembly Line where we have three machines which cuts sheet metal to length and at the end of the line they all come together and become a tank subassembly. Think of those three components as a Front Panels, Rear Panels and Bottom Panels. The three machines which make the respective panels can start simultaneously and work in parallel. I was hoping to model the Tank Subassembly model as follows(Simplified):
Tank Subassembly
--- Front Panel (Phantom)-1 Qty