Running Data Load Rule for multiple periods causing MaxL script to fail
Hi all,
I'm using FDMEE (11.1.2.3) to load data to an essbase ASO cube using open interface method.
I have an after load scipt set up to read the information such as period, entity and location then triggers a bat file that will pass this parameters and trigger a MaxL script that calculates currency translations.
All these set up works great if I execute the DLR for just one period, but when I run it for a couple of periods it fails to do the currency translation, then I load the data period by period and confirm that translated figures are there.