QM approval by BP
Hi,
I have tests that are specific by branch plant. Workflow is activated using WFS structure. So the approval flow is working fine within this BP.
Now we have another branch plant with QM but we need to have a different aproval structure since we don't have the same people approving.
Is it possible to link different structure? If we use a different parent number in P0150 how can we link the structure to the parent?
Thanks
Mike