P6 EPPM R19 - Define project baseline for multiple projects and restore baseline

edited Oct 27, 2019 5:06AM in Primavera (MOSC) 3 commentsAnswered

Hi,

In P6 Professional R6.2, was able to open multiple projects, add baseline to these (via  Project/Maintain baseline) then assign these new baselines to individual project (via Project/Assign baseline).

Do not seem to be able to do this with P6 EPPM R19? Is there a way to do this?

Thanks.