In multi-branch manufacturing, final assembly is performed in BP12 but BOM for component sub-assembl
When creating BOMs for branch plant (BP12) packaging/bottling we cannot source the tablets from BP12.
Tablets are manufactured in BP10 then transferred to and packaged/bottled in BP12 as FG (finished goods).
The tablets do not have a BOM in BP12 as they are not manufactured there.
We copy 07 costs of tablets from BP10 to BP12 and freeze (using R30890 and R30835).
When we run R30812 (simulation) for the FG most of the manufacturing costs for the tablets are dropped and the FG cost is incorrect.
In BP12 BOM, when we change the component source of the tablets to BP10 then the correct cost is calculated.