How can I copy RAC node to another, different RAC node?
I have two 11.2.0.4 two-node RAC clusters, one for prod, one dev. I want to copy prod to dev. I currently backup with RMAN.
I've googled this but I keep getting lost in the "a dozen ways to skin a cat" weeds. It won't hurt if I mess up dev, but still I'd rather not spend forever on this.
Thanks!
Nathan