Period name parameter not incrementing in scheduled program
Hi, In R12.1.3, WIP value report is scheduled to run every 1 month but the Period name parameter is not incrementing.
1
Hi, In R12.1.3, WIP value report is scheduled to run every 1 month but the Period name parameter is not incrementing.