Need conversion tool for Oracle Primavera Enterprise 18.8 to Professional 18.8
Hello All,
We need to downgrade our P6 Primavera installation from Enterprise to Professional after upgrading the version to 18.8. Our clients do not want to use Web Access and that is good for us because that will make maintenance much simpler.
I was given this article reference by an Oracle support engineer: How to Convert An EPPM DB to PPM DB or a PPM DB to EPPM DB? (Doc ID 2088877.1)
In which it seems the conversion tool provided with that article will only convert a version 15.2 database based on this text:
"The migration utility download available below can only be run against a 15.2 database release version."