R12 FIFO Costing
We have to convert items into a new organization that is set to FIFO consting. What is the best method to load items / costs to create the initial cost layer for FIFO during the conversion? Misc Receipt with cost doesn't seem to calculate the FIFO cost.
Thanks
Don