E1Page from 9.1 to 9.2
Hi, We are upgrading Tool from 9.1.5.9 to 9.2.4.1 for non prod and will do the same for PROD will upgrade tool after sometime. We already upgrade the TR for DV and PY. Now as per client requirement we want to transfer live 9.1 PD E1Page to 9.2 DV for testing. Is there a way to transfer those E1Page from 9.1 tool to 9.2 tool without upgrade the tool. Please help. Thanks Ramsjaeevan