How to use Lot Cost based markup for the IR-ISO process between Process Manufacturing Organizations
I have 2 Process Manufacturing Inv Orgs that are using Lot Costing method. These are setup under different Operating Units.
I want to perform IR-ISO between these 2 Inv Orgs.
We need Transfer Price = Lot cost in shipping Org + 5% Markup for ALL ITEMS
How to achieve this using Advanced Pricing?