Production Scheduling : someone wants to change the resource quantity in PS ? (Enhancement Request 3
Hi,
In my company there are many Production Scheduling users (120+). They need to change directly in PS the resource's quantity used to produce a work order operation.
As you can see on the screenshot, the modification is possible to do in PS, in the operation properties. (Equipe #2 changed from 1 to 2, to produce faster).
But when you validate the modifications done, PS crashes systematically.
I entered a SR to obtain a PS patch from Oracle to fix this ISSUE. But they told me this is not an ISSUE but if I want to have this functionality operationnal, I need to enter an ENHANCEMENT REQUEST.