edited Aug 11, 2020 5:00AM in Manufacturing - JDE1 (MOSC) 3 commentsAnswered

Hi,

We are using batch BOMs and when RRP is run the numbers I am getting do not reflect what they should be.

Item A have a batch size of 42600 and uses an item B (child) that has a batch size 43500.

The RRP calculation for the B item is very good but the RRP for A item combines both routing of the A and B item and it does not seem to divide by the batch size.

For Ex Item B gives a load of 5.5 Hrs f on WC1

For item A it gives a load of 5.5*42600= 234300 hrs on WC1