Loaded cost for 2101 but the Fixed burden is wrong.
Loaded cost for 2101 but the Fixed burden is wrong. Can we delete the fixed burden ?
Is there an alternative? If we load the correted cost in 2102 and then copy it to 2101, will the issue be corrected?
Means all the costs will be copied correctly?
Best Regards,
Suchismita