Reference (Doc ID 371064.1) -How to Analyze OPM Variances FAQ
The OPM MAC Subledger calculates manufacturing variances relating to the closing of a production batch.
When these variances are calculated, are they stored in a table somewhere or always calculated when the job is ran?
0