How Can I Copy a Project with the Baseline in Oracle Primavera Cloud?
Hi ,
I have a project with assigned baseline and I want to make a copy of this project with the same baseline assigned. How can I do that?
When I copy the project and select all the options available ( activities, codes, ...) there is n baseline to select.
Thanks☺️