Implementation of a New GRID from a dataguard
edited Mar 4, 2021 5:05PM in High Availability Data Guard, Sharding and Global Data Services (MOSC) 3 commentsAnswered
Hi,
I was wondering if me scenario was possible. We want to move from a Standalone Rac 12.2 Database to a 19C Rac cluster.
I have read that we can have 2 different binary.
My plan is :
- Setup the new RAC Cluster in 19c
- Configure a standby From the 12.2 to the 19c Cluster.
- When ready, Switch over on the 19c Cluster then perform the Database Upgrade.
- Remove the 12.2 "New Standby" database
- Create a new standby on a new server.
Does it make sense ?
Regards
0