New Project Costing BU setup
I am trying to set up a new project costing business; the setup I believe is correct, but I am receiving the error message listed below:
"Change Control Template is Required." "When Change Control is enabled, a template is required. Either select/add a template or disable Change Control."
I have disabled the change control on the 'PROJECTS' workbench template as well as set all fields to 'OFF' on the Change Control Template itself.
I've been unable to determine where / if the change control template needs to be tied to my new BU.
Has anyone else encountered this issue?