MRP date calculation with work center in maintenance
Good morning all
i would like to ask a question about a possible MRP configuration.
the staring point is that we don t use maintenace module in the installation.
we have 9.1 release.
the situation is the following.
we have a work center that is in maintence (cannot be used) in sept and oct 2021.
we have a lot of demand item related to this work center.
we have not the possibilities to switch the work center with another one (phisically i mean): so we need that MRP keep in mind that in sept and oct that WC cannot be used in his calculation.