Good morning all

i would like to ask a question about a possible MRP configuration.

the staring point is that we don t use maintenace module in the installation.

we have 9.1 release.

the situation is the following.

we have a work center that is in maintence (cannot be used) in sept and oct 2021.

we have a lot of demand item related to this work center.

we have not the possibilities to switch the work center with another one (phisically i mean): so we need that MRP keep in mind that in sept and oct that WC cannot be used in his calculation.