WIP: Lot control item
Hi,
Quick question on lot control component,
Item: WIP-1 ( Lot controlled)
Raw Material-1 lot controlled Push
Raw Material-2 Operation pull
Currently we do following two transactions.
WIP issue Raw Materia1-1 to Work Order
then Complete the Job.
============================================================
is it possible to make the about in just one transaction.
ex:
Item: WIP-1 ( Lot Controlled )
Raw Material-1 Lot Controlled Operation Pull
Raw Material-2 Operation Pull
Can we just do
WIP Complete and provide the
Lot Number to consume for Raw Material-1
and Lot Number for the WIP-1 which is being completed and produced.
We are using interface tables
MTL_TRANSACTIONS_INTERFACE