Document Number OV - Landed Cost
Hello
When a receipt is made with the additional costs for the p4312 application, the system is generating a different consecutive entry document (OV) for material and another for the additional costs.
Is it possible to have the same OV document number taking into account that the supplier is the same?
BR
William