GLLEZLSRS/'Journal Import' spawned cp error 'no control rows were found in GL_INTERFACE_CONTROL'
Product: Oracle EBS General Ledger
Version: 12.2.6
I have created a custom package/concurrent program that loads data from a file into a custom stage table, generates all required fields and populates the GL_INTERFACE table. I would like to also submit the Journal Import program from this package/cp but the spawned job 'Journal Import' errors as shown in the log file below:
SHRD0118: Updated 1 record(s) in table: gl_interface_control +---------------------------------------------------------------------------+ Start of log messages from FND_FILE +---------------------------------------------------------------------------+ +---------------------------------------------------------------------------+ End of log messages from FND_FILE +---------------------------------------------------------------------------+ +---------------------------------------------------------------------------+ No completion options were requested. Output file size: 432 No control rows were found in the GL_INTERFACE_CONTROL table. Please contact your system adminstrator.