In P6 Professional R19.12 Import the same Resource ID multiple times to an activity?
Hello,
I want to import an Excel spreadsheet to assign a Resource ID to the same activity multiple times. P6 Professional is only assigning the respective Resource ID one time to an activity. The Max Units/Time of this resource is 16 h/d, so I should at least be able to assign it twice to the same activity.
Excel Spreadsheet: Resouce ID to Activity ID assignments.
Resource ID Max Units/Time
P6 Schedule with Imported Excel Spreadsheet
PIPE1050 has no Resouce IDs. Can you make multiple Resource ID assignments on a line? using a comma separator?
PIPE1070 should have two ASSO SCN, it only has one. (Max Units/Time is 16 h/d.)
I want to import an Excel spreadsheet to assign a Resource ID to the same activity multiple times. P6 Professional is only assigning the respective Resource ID one time to an activity. The Max Units/Time of this resource is 16 h/d, so I should at least be able to assign it twice to the same activity.
Excel Spreadsheet: Resouce ID to Activity ID assignments.
Resource ID Max Units/Time
P6 Schedule with Imported Excel Spreadsheet
PIPE1050 has no Resouce IDs. Can you make multiple Resource ID assignments on a line? using a comma separator?
PIPE1070 should have two ASSO SCN, it only has one. (Max Units/Time is 16 h/d.)
Tagged:
0