How to add newly created Material Overhead in the item cost definition of already existing items
How to add newly created Material Overhead in the item cost definition of already existing items?
We have a lot of items already existing in the system in an org with some cost definitions; We have created a new overhead cost element and we want to associate that to all the pre existing items; How can we do it?
We have a lot of items already existing in the system in an org with some cost definitions; We have created a new overhead cost element and we want to associate that to all the pre existing items; How can we do it?
0