While upgrading to Golden Gate 19c, can we utilize the binaries from a 19c with 12c DB?
We are upgrading Golden Gate to 19c in phases.
Phase one - Upgrade Golden Gate 19c from 12c and upgrading the target database to 19c shortly after Golden Gate.
Phase two - upgrade the source database to 19c.
The question/issue is: When we upgrade Golden Gate to 19c you need to specify the database connection. We would like to choose 19c since both the source and target will eventually be at that version. When going through the configuration process it requires 19c Oracle database binaries to be installed. I would like to install the 19c database binaries for the target database and use those binaries for the install/configuration. But I am not sure if the database needs to be active on those binaries or if it is using the binaries as a pass through connectivity.
Phase one - Upgrade Golden Gate 19c from 12c and upgrading the target database to 19c shortly after Golden Gate.
Phase two - upgrade the source database to 19c.
The question/issue is: When we upgrade Golden Gate to 19c you need to specify the database connection. We would like to choose 19c since both the source and target will eventually be at that version. When going through the configuration process it requires 19c Oracle database binaries to be installed. I would like to install the 19c database binaries for the target database and use those binaries for the install/configuration. But I am not sure if the database needs to be active on those binaries or if it is using the binaries as a pass through connectivity.