auto restart of database scheduled job
Hi,
i have a database scheduled job that runs at 5am. The server went down at 4am and came back up at 6am. The 5am job automatically started as soon as the server and db went online. How can i prevent this? Do i put an end date?
i have a database scheduled job that runs at 5am. The server went down at 4am and came back up at 6am. The 5am job automatically started as soon as the server and db went online. How can i prevent this? Do i put an end date?
0