Is it possible to massively update the period in grower management JD Edwards (9.2)?
Hello.
I need to update the period (2022) to the farms, I need to do it massively because there are more than 1500 farms, usually it is done one by one through the P40G02 program. Is it possible to do it massively?
Thanks a lot.
Tagged:
0