WHY IN BOM STPP IS CALCULATED WITH EXTRA QUANTITY
EXAMPLE:
WHEN YOU PUT A YIELD OF 97 IN ROUTING IN BOM CALCULATE STPP AS 3.09, IF YOU YIELD IS 98 STPP IS CALCULATED AS 2.04M I GUESS IS DIFERENCE 100-% 98= 2, AND 100-98/100=.02 AND THEN THE SYSTEM CALCULATE 2*(1+.02)= 2.04, IF IT IS 3*(1+.03)=3.09,
BUT THESE ARE MY CONCLUSION, IS IT CORRE3CT?