Looking for Peers with Fully Resource Loaded Preconstruction Schedules that charge Actuals
I am looking for other Oracle P6 Professional users that utilize fully resource loaded schedules to aid planning & reporting in their preconstruction departments. We are an electrical subcontractor in the construction industry that leverages P6 Team Member to track what and when are resources are working on. P6 is a very powerful tool for tracking schedule progress, but I am having trouble finding other resources that utilize this system the same way we do. If you have any knowledge or interest in working with fully resource loaded schedules I'd be happy to connect and share tips & tricks!