Multibranch Setup for MRP
Thanks in advance!
We are on version 9.1, upgrading to 9.2 over the next few months.
We are planning to open a new distribution facility in the next few months, moving us to three. We are trying to determine how to set up the branch/plant relationships and/or how to run MRP.
Branch A is on the West Coast. Branch A has three manufacturing facilities as separate branches
Branch B is on the East Coast. branch B has a single manufacturing facility (as a separate branch)
Branch C is the new facility in the mid-West. At this point, we do not plan to have manufacturing in this facility, but that's likely to change.