Switchover cacaded standby to primary
Hello,
I have data guard between three sites:
1- Main site (3 nodes rac)
2-HA site (single instance)
3- DR site (2 nodes RAC)
HA site is a physical standby database from main site and sends redo logs to DR site (cascaded standby)
i need to test the configuration by switching the DR site to primary and the main site to standby and i need test scenarios and how to achieve this.
Grid version is 11.2.0.4 on all sites
RDBMS version is 11.2.0.4 on all sites.
Thanks,