Does Production schedule allows to release the Unreleased Work orders from PS workbench back to ERP?
1. Ran the PS Plan and it's showing released and Unreleased status jobs at PS workbench after the solve.
2. Approve the Model
3. Publish
4. Expected results: Unreleased jobs should publish back as Released status job in ERP.
1