Scheduled Oracle Reports not running at correct time in Winter
Hi,
I have some reports scheduled to run at 11am. In Winter however they are running at 10am. I suspect it is because of daylights saving time. How do I configure my Oracle Reports Server 12c to always run my report at the same time during the year regardless of winter/summer time?