PBCS Error using refresh database
Message:
An error occurred during the cube refresh operation: com.hyperion.planning.HspRuntimeException: Cube refresh failed for Essbase Cube: ****, Message:
error set member [xxxxxx] alias [xxxx] in alias table [default] with status[1060203].
Level 0 virtual member [xxxxx] must have a formula associated with it. (Data storage is Dynamic Calc)