Bill of Material (BOM) Query - Can you change item revision from LOV?
Hi,
We have a bill of material (BOM) against an item which has 3 revisions in total.
1) '### from 11-APR-2019 to 11-APR-2019'
2) '001 from 11-APR-2019 to 01-FEB-2023'
3) '003 from 01-FEB-2023 to 01-FEB-2023'
The user has added revision 3 in error. What I'd like to know is what options are available for updating and changing revisions.
The user wants to change the revision to revision 2. However, when I attempt to update this from the front end and save, forms just state 'no changes to make'.
I've thought about creating a new revision but documentation says the the dates (of each revision) are not suppose to overlap. Is it possible to delete the 3rd revision?