Why doesn't the R17025 update MRRYN Meter Reading Required
When uploading equipment, the Allow WO field can be updated. When creating the equipment extension, the Allow PM Schedule gets updated. How do I update the Meter Reading Required?
0
When uploading equipment, the Allow WO field can be updated. When creating the equipment extension, the Allow PM Schedule gets updated. How do I update the Meter Reading Required?