JDE E1: Will P4074 consider Advance Preference processing when used standalone?
Hi,
Issue: P4074 SXXXXX version calling P4210 SXXXXX version with advance preference activated, does not default the date configured in Sales Price Based on Date preference.
Configurations:
We have defined Sales price Based on Date Advance Preference,
Above Preference is configured in P4210 Processing option.
Above P4210 version is configured in P4074 Processing Option.
When using P4074 as standalone, the Price effective date defaults to Today's date instead on Date (10/31/2022) configured in Advanced Preference,
Entering necessary details still defaults today's date,
When P4074 is called through P4210/P42101 it will work because the correct date gets passed through Form Interconnect.