How to re-baseline a range of award budgets in Oracle apps R12.2.11
I see that there is a patch available for R12.0 and R12.1
R12 Grants Accounting Patch for Award Budget Baselining Run in a Range (Doc ID 731535.1)
Is there something for R12.2?
Thanks
Tagged:
0