New HowTo Document About the Work Order Start Date Processing Option
Component requested dates can now be based on either the work order start date or the start date of the operation utilizing the component when attaching a work order parts list. Prior to this enhancement, requested dates were always based on the start date of the work order, which is not ideal for manufactured items with long production cycles. Read more about this enhancement with the Work Order Start Date Processing Option in Order Processing (R31410) and Work Order Routing (P3112). Doc ID 2940477.1. https://bit.ly/3pzHc03
#E1Manufacturing #ShopFloorControl