Lump sum cost - resource assignment

I have a requirement to cost load my activities with lumpsum costs as well as resources who are assigned various rates.

What is the best way to manage lumpsum costs? I'm thinking of using the excel export and update the costs in excel and re-upload into OPC. The other resources can be cost loaded using the various rates assigned to them.


Any ideas ?