Why does the S&D app (p4021) shows RS document types instead of WP for planned dependant demand?
JD Edwards EnterpriseOne 9.2.5.5
The Supply and Demand app (P4021) is showing RS document type instead of WP document type when a purchased item has dependant demand. There is only level in the BOM structure and the FG is a Rate Schedule Item. Thanks.