buffer size for part
R12.2.10 Ebiz Oracle
Is there a way in EBS to standardize a scrap quantity or buffer size at a part level that will be placed on a work order to automate the need for additional material? This would be outside of the BOM quantity. For example, the BOM may be setup as 10 inches, however, the machine needs 2 additional inches to hold the material. The WO should call out for an additional 2 inches per X inches.