E1: 31P: ETO : Is it possible to enter an Asset Number at Project Level instead of O2(Requ) level ?
JDE 9.2.7.1
Hello,
In P31P001, would it be possible to enter an Asset ID for all the project?
Then the user would not need to enter the same asset ID for each requisition(O2).
It would reduce the risk of error
The O2 would then inherit 'Asset ID' from the project.
I found out that in 'Order Details' Tab, I have an 'Asset Number' and a 'Unit Number'
which I populated. This action creates a record in F4801-WO Master File. Order Number = Task Number of my ETO project.
How can I configure P31P001 to get the 'Asset ID' automatically from F4801 when I create a requisition (O2)?